In job structures, bills of material and activities are combined to form a project. You can create structures even before the quotation stage and use them as a quotation bill of materials and calculation basis. During the design phase, structures are used to determine the required materials and the required effort in detail. You can create several structures for one project or save versions of individual structures. The products developed or configured here for specific orders can be transferred to production as a whole or in assemblies.
17031: EX090 M365 Add event in report ‘M365 Explode Prod. Item’ (5130112), to be able to set boolean field ‘Calculate prices’ to ‘false’ by default
17004: EX090 M365 In page ‘Engineering setup’ in italian language the labels ‘Project transfer location’ and ‘N. routing standard’ aren’t translated
25.0.20
Released: On Premise: 10. January 2025 | SaaS: 10. January 2025
16313: EX090 M365 Change, in page ‘Sales order’, label ‘Extended Data (M365)’ to ‘Engineering’
25.0.19
Released: On Premise: 07. January 2025 | SaaS: 07. January 2025
16947: EX090 M365 Add event in table ‘M365 Batch Quote Vendor Line’, to influence execution of function InsertItemVendorEntry
25.0.18
Released: On Premise: 23. December 2024 | SaaS: 23. December 2024
16870: EX090.04 ETO In page ‘Project structure card’, “sales” functions lines create documents not considering items translation
16690: EX090.04 ETO In page ‘Item ledger entry’, posting reclassification with flag ‘Prevent Project Structure Negative Inventory’ abled in ‘Engineering setup’ the flags ‘Project structure no.’ and ‘Project structure entry no.’ are filled
25.0.15
Released: On Premise: 15. November 2024
16579: EX090 M365 Fields ‘Project structure no.’ and ‘Entry no.', in table ‘Time sheet lines’ aren’t present in table ‘Time sheet lines archives’
16451: EX090.04 ETO In page ‘Project structure card’, using report ‘Copy project structure’ and template with field ‘Constr. structure template’ populed in ‘Project Assisted Creation’, fields ‘Starting date’ and ‘Ending date’ on lines aren’t filled
16531: EX090.04 ETO Add event in report 5130118 ‘M365 Job Create Prod. Order’, when creating production order
25.0.13
Released: On Premise: 13. November 2024
16451: EX090.04 ETO In page ‘Project structure card’, using report ‘Copy project structure’ and template with field ‘Constr. structure template’ populed in ‘Project Assisted Creation’, fields ‘Starting date’ and ‘Ending date’ on lines aren’t filled
25.0.12
Released: On Premise: 11. November 2024
16468: EX090.04 ETO In page ‘Project structure card’, using field ‘Eos job assisted creation code’ to create a 2nd or more quote structure, structures of type “always” are created
15692: EX090 M365 When function ‘Calculate detailed costs’ (in ‘Project structure card’) is executed, reference to project structure in table ‘Change log entry’ isn’t deleted
16066: EX090 M365 In page ‘Project structure card’, selecting through function of field ‘No.’ another series no. linked via relationship, this isn’t set
15889: EX090 M365 In ‘Sales order’ with line of type ‘G/L account’, selecting ‘Project structure’ to create a new project structure is requested to be filled field ‘Location code’
15937: EX090 M365 MODUS Make app compatible with BC25
24.0.23
Released: On Premise: 11. September 2024
14871: EX090 M365 Add possibility to create job structures (even already configured) from pages ‘Sales orders’ and ‘Job card’
24.0.22
Released: On Premise: 12. July 2024 | SaaS: 15. July 2024
15498: EX090 M365 Check, when assigning free purchase line in project structure disposition, value on ‘Q.ty outstanding’ instead of that on ‘Q.ty to receive’
24.0.21
Released: On Premise: 27. June 2024 | SaaS: 28. June 2024
15432: EX090 M365 In page ‘Project structure card’, information of a line is copied on other lines, even if ‘Description’, ‘No.’ and ‘Level’ are different
24.0.20
Released: On Premise: 10. June 2024 | SaaS: 11. June 2024
15304: EX090 M365 In table ‘M365 Job Structure Line’, filling field ‘Sales Line Discount %’ returns error ‘There is insufficient memory to execute this function. This can be caused by recursive function calls…(COMPLETE TITLE IN SYSTEM INFO)
24.0.19
Released: On Premise: 05. June 2024 | SaaS: 07. June 2024
15307: EX090 M365 Job queue 5130135 starts again after 12 hours, colliding with the previous one sending it wrong even if the process timeout has been changed
15301: EX090 M365 In page ‘Project schedule’, selecting function ‘Use standard task schedule’ the field ‘Type’ on line is filled with wrong value ‘2’
24.0.16
Released: On Premise: 15. May 2024
15194: EX090 M365 In page ‘Project structure Card’ and in italian language, lauching function ‘Create sales order’ for multiple item lines returns wrong error ‘La strategia di ricerca non è stata presa in relazione all’assemblea’
24.0.15
Released: On Premise: 17. April 2024
14904: EX090 ETO In italian language, searching for ‘Commesse’ it’s not possible to find pages related to ‘Progetti’
14487: EX090 ETO M365 Modify translations from job and project, to uniform app to BC24
23.0.15
Released: On Premise: 23. February 2024 | SaaS: 23. February 2024
14322: EX090 M365 In page ‘Job ledger entries’, for invoices and credit memos in foreign currency linked to job structure the field ‘Line amount (LCY)’ is uncorrect
23.0.14
Released: On Premise: 15. February 2024
14218: EX090 M365 In page ‘Sales order’, using function ‘Job structure’ the value for ‘Task no’ is uncorrect
23.0.13
Released: On Premise: 02. November 2023 | SaaS: 29. January 2024
13320: EX090 M365 In page ‘Job ledger entries’, for sales lines the field ‘Currency code’ is non filled
13294: EX090 M365 Posting invoice o credit memo in foreign currency linked to a job structure, amounts and prices in ‘Job ledger entries’ are uncorrect
13245: EX090 M365 Add event, to make possible to manage some jobs with BC standard
11807: EX090 ETO Remove warning messages
13224: EX090 M365 In ‘Production order’, trying to post consumption of semi-finished product in job is obtained error ‘Insufficient quantity for item (item code) (job structure code) in inventory.’